Modular flats and family houses for housing associations
Published . Last updated . Reviewed by Will Gardener, Managing Director.
- NuHome is the main contractor for factory-built homes for housing associations: flats and family houses from one module system.
- The homes are made by our manufacturing partner, TLC Modular, under our BOPAS Full Accreditation. BOPAS gives lenders, valuers and insurers independent assurance that the system will last.
- One UK team is accountable from site appraisal to handover.
Which UK modular providers offer both flats and family houses for a housing association?
NuHome does. Our range runs from a 1-bed flat to a 2-bed house and a 3-bed family house, all built from one module system. Our current scheme, for a registered provider in Wiltshire, mixes all three: 4 one-bed flats, 4 two-bed houses and 10 three-bed houses.
Which modular builders handle the whole job, from site appraisal to handover?
NuHome runs the whole job as main contractor, in three steps:
- Appraise the site. What fits, how many homes, the planning route and an outline programme.
- Set up the funding. We help you choose the route, such as Homes England grant plus borrowing, a lease-based structure or a partnership with a council that takes nomination rights. Then we price against it.
- Build, install, hand over. Factory manufacture by TLC Modular, sea freight (about 5 weeks to a UK port), craning onto prepared foundations, connections, testing, certificates and a resident guide for every home.
Are the homes suitable for families?
Yes. The 2-bed house (3 person) and 3-bed house (5 person) are two-storey family homes, built as terraces or semis, with solar PV on every home. The housing association owns them. Plans and specification sheets are available on request.
How do the three NuHome house types compare?
| House type | Internal area | Bedrooms and occupancy | Modules | Plans |
|---|---|---|---|---|
| 1 bed flat (S1-2) | 52.5 m² | 1 bed, 2 person | 2 × 40 ft per flat, in a 2 storey block of 4 with a 20 ft core module per floor | 1 bed flat |
| 2 bed house (S2-4) | 83.5 m² | 2 bed, 3 person (also lets as 4 person) | 6: five 20 ft container size and one 3.4 m wide | 2 bed house |
| 3 bed family house (S3-6) | 105 m² | 3 bed, 5 person (also lets as 6 person) | 4 × 40 ft container size | 3 bed house |
Areas are approximate internal areas from the concept plans. Every type is designed to a high EPC B target, to be confirmed by an accredited SAP assessment.
What assurance does a housing association get?
| Assurance | Detail |
|---|---|
| Accreditation | BOPAS Full Accreditation held by NuHomeUK Ltd, certificate PRJ11100530890-2, issued by LRQA on 25 April 2025, valid to 25 April 2028 (subject to surveillance) |
| Durability | 60 years, assessed under BOPAS |
| Contract | NuHome as main contractor, TLC Modular as manufacturer |
| Defects | 2 years defects cover |
| Emergency | 24-hour emergency response; urgent repairs within 5 working days, routine within 20 |
| Inspection | Every module inspected before shipment and again on arrival |
| Handover | Product warranties registered to you, maintenance manual and resident guide for every home |
View the BOPAS certificate (PDF)
How long does a modular scheme take?
The modules are made in the factory while the groundworks are done, so the two run in parallel instead of one after the other. On our Wiltshire scheme, the site work restarted in September 2026, all 18 homes ship in one consignment in early 2027, and completion is due in May 2027.
FAQ
What types of homes does NuHome deliver?
NuHome delivers 1 bed flats (52.5 m²), 2 bed houses (83.5 m²) and 3 bed family houses (105 m²), all from one steel framed module system. Each type has its own page with floor plans, room sizes and module details.
Does NuHome install the homes?
Yes. We are the main contractor. Our UK team handles the site, installation, compliance and handover. TLC Modular manufactures the modules. Groundworks, module installation, connections, testing and a full handover pack are included.
Is NuHome accredited?
Yes. NuHomeUK Ltd holds BOPAS Full Accreditation for the TLC Light Gauge Steel Volumetric Solution, issued by LRQA (certificate PRJ11100530890-2), valid to 25 April 2028 subject to surveillance.
Who owns the homes?
The housing association owns the homes and manages them. NuHome is the main contractor and hands them over complete, and the council can take nomination rights where a council is a partner on the scheme.
How do I start a scheme with NuHome?
Send us a site. We appraise it and come back with what fits, how many homes, the planning route and an outline programme. Submit a site
