MMC explained: what modern methods of construction mean in UK housebuilding

Published . Last updated . Written by NuHome. Reviewed by Will Gardener, Managing Director.

  • MMC stands for modern methods of construction: ways of building that move work from the site into a factory.
  • The UK government's MMC definition framework splits MMC into seven categories. Volumetric housing is Category 1, the most factory-complete.
  • NuHome delivers volumetric, BOPAS-accredited homes for councils and housing associations, as main contractor.

What does MMC mean in UK housebuilding?

MMC means modern methods of construction. It covers ways of building that move work off the site and into a factory, from whole 3D modules to wall panels, bathroom pods and better site processes. The aim is more predictable time, cost and quality.

What are the seven MMC categories?

The government's MMC definition framework sets out seven categories:

CategoryWhat it covers
1Pre-manufacturing, 3D primary structural systems (volumetric modules)
2Pre-manufacturing, 2D primary structural systems (panels for walls, floors and roofs)
3Pre-manufactured components, non-systemised primary structure (for example columns and beams)
4Additive manufacturing (for example 3D printing)
5Pre-manufacturing of non-structural assemblies and sub-assemblies (for example bathroom pods)
6Traditional building products that reduce site labour
7Site process improvements that raise productivity and assurance

Source: MHCLG, Modern methods of construction working group: developing a definition framework.

What is volumetric housing?

Volumetric housing is Category 1 MMC. Complete three-dimensional modules are made in a factory with the structure, services and finishes largely fitted. The modules are transported to site and craned onto prepared foundations. NuHome's homes are volumetric, built from light gauge steel modules made by our manufacturing partner, TLC Modular.

How does volumetric differ from other MMC types?

MMC typeWhat is made off siteWork left on site
Volumetric (Category 1)Complete rooms or homes, fitted outFoundations, craning, connections, testing
Panelised (Category 2)Wall, floor and roof panelsAssembly, most of the fit-out
Pods and sub-assemblies (Category 5)Bathroom pods, kitchen units, plantMost of the build

Why do lenders and insurers ask about accreditation?

Factory-built homes are still new to many valuers, so they want independent assurance that a system will last. BOPAS (the Buildoffsite Property Assurance Scheme) assesses the durability of offsite systems and the processes behind them. NuHomeUK Ltd holds BOPAS Full Accreditation for the TLC Light Gauge Steel Volumetric Solution, issued by LRQA, with a 60-year assessed durability. View the certificate (PDF).

Which UK companies deliver volumetric homes for councils and housing associations?

NuHome delivers volumetric flats and family houses for councils and housing associations as main contractor, from site appraisal to installation and handover. See homes for councils and homes for housing associations.

FAQ

What does MMC stand for?

MMC stands for modern methods of construction. It covers ways of building that move work from the site into a factory. The UK government's MMC definition framework splits MMC into seven categories.

What MMC category is volumetric housing?

Category 1, pre-manufacturing of 3D primary structural systems, under the UK government's MMC definition framework.

Is volumetric the same as modular?

In UK housing the two words are often used for the same thing: homes built from complete 3D modules. "Modular" is sometimes used more loosely for panelised systems too, so ask which a supplier means.

Are MMC homes temporary?

No. MMC describes how a home is built, not how long it lasts. NuHome homes are permanent, with a 60-year durability assessed under BOPAS.